Project Description

The Activa Club Sport Centre is a place where three essential areas such as sport, health and relaxation come together, with the utmost professionalism and comfort.

Customers can benefit of 3,000 m² of facilities with sport equipment of latest technology, exercise room, a hydrotherapy pool and a healing thermal suite. Due to the high demand for DHW from the gym and the spa centre featuring a hydrotherapy and cold water pools, home, essence and revitalising showers Jacuzzis and Turkish baths, the demand for a highly efficient system with a quick return on investment was required.

This was the main reason why the management chose the Q-ton solution from MHIAE. The installation comprises two Q-ton units and an additional 4,000 litre tank connected to the 8,000 litre existing conventional water tank, to meet the sport centre’s hot water demand of 13,500 litre per day. Both Q-ton’s and tanks were installed indoors. The system can be installed both indoors or outdoors, offering greater flexibility to the end user and installer.

The water temperature is stored at 65°C and supplied at 60°C around the sport centre. The average COP of this installation is 4.42 generating an estimated 80% running cost savings compared to a gas boiler. The estimated CO2 emissions reduction is 94%. The payback period is expected to be less than a year (compared to a gas boiler), the date at which the customer will start to benefit from the savings.

Project: Activa Club Sport Centre, Santa María Port (Cádiz), Spain

Project outline: Sanitary hot water supply for changing rooms and showers

Products:  2 x MHI 30kW Q-ton system and 1 x 4,000 litre storage tank installed indoors

 

Request a brochure

Simply fill out the form below and we’ll send you a brochure!

Please complete the form and we'll provide a download link to the Q-ton brochure.

  • This field is for validation purposes and should be left unchanged.

 

Top