Skip to main content
 

Lancaster Hall Hotel

Back to Case Studies

Project Description

The Lancaster Hall Hotel is situated in the heart of London’s popular Lancaster Gate & Bayswater which attracts many tourists and business travellers.

In order to ensure that Lancaster Hall Hotel could deliver sanitary hot water efficiently for all of their customers, MHIAE connected two Q-ton to two 2,000 litre hot water storage tanks. The hotel consists of two separate boiler rooms with completely segregated hot water and heating systems utilising five boilers running at different pressures in order to cater for 250 people on site.

The system is now fully operational and supplies 12,000 litres per day of domestic hot water at 65°C. The hotel is now saving up to 40% running costs reductions compared to their existing boiler and 45% savings on carbon emission. Mitsubishi supplied an effective solution improving quality and comfort to their client. Q-ton ticked all the boxes and contributes to substantial running cost and carbon emission savings.

Project: Lancaster Hall Hotel, London

Project outline: Sanitary hot water refurbishment

Products: Two 30kw Q-ton system and Two 2,000 litre hot water storage tanks

 

Request a brochure

Simply fill out the form below and we’ll send you a brochure!

Please complete the form and we'll provide a download link to the Q-ton brochure.

  • This field is for validation purposes and should be left unchanged.

 

Top